History of GC “UNICOM”
The year of the founding of the company "UNIKOM". Start of production of sealing rings (components) for fountain shut-off valves. Delivery to JSC "Corvette", JSC "Ikar", JSC "Corvette", PJSC "Surgutneftegaz".
UNICOM became a member of the Scientific and Industrial Association of Rebar Builders.
The launch of a mechanical processing workshop with an area of 2056 m2. Production of the first unit of the averaging and cleaning tank for BJ Services Company.
Clean-up day, corner of shop No. 1.
UNICOM's first participation in the exhibition of oilfield equipment at the All-Russian Exhibition Center, Moscow.
The launch of workshop No. 2, with an area of 1,193 m2. The production of receiving bridges has been mastered.
Together with the Gubkin Russian Academy of Oil and Gas, a modern technology for painting equipment has been developed and implemented.
The launch of the assembly and welding workshop No. 3, with an area of 1589 m2.
Development of the corporate culture of UNICOM, the first team building of the team.
The launch of the workshop for the production of chassis No. 4, with an area of 2265 m².
The appearance of the first OKUMA turning and milling machining centers.
Opening of a representative office in Beijing, China.
The launch of the assembly and welding workshop No. 5, with an area of 1,575 m².
The company's breakthrough in the field of mechanical engineering and blacksmithing is the acquisition of the first Russia's rotary forging machine GFU.
The release of a new modification of the steam generator set on the all-wheel drive chassis of the GAZ "Countryman" car.
Entering the market of Kazakhstan.
Development of a circulating purification system and a project for the manufacture of a polyethylene container.
Design of an on-board two-axle trailer with a lifting capacity of 10 tons.
Launch of polymer products workshop No. 6, with an area of 3828 m².
Development of a three-axle side-mounted off-road trailer. Launch of a production line for spiral-wound pipes reinforced with polypropylene pipe.
Shipment of the first batch of capacitive equipment on an automobile chassis to Serbia.
The beginning of operation of the polyethylene solution-salt unit for YARGEO, with a capacity of 260 m² /day, the equipment is completely made of polyethylene.
Design and manufacture of a solid-forged axle beam with a lifting capacity of 12 tons.
Production of the first sample of the rear axle half-axle casing for GAZ cars. The launch of metal cutting workshop No. 7 with an area of 1,445 m².
Commissioning of a remote control system with a capacity of 500 m²/ day at the Verkhnechonskoye oil and gas condensate field.
Serial launch of production of axle casings for GAZ vehicles.
Acquisition and large-scale reconstruction of a stone foundry, the start of stone casting production.
Implementation of the project on sewage treatment plants for EXPO-Yekaterinburg, under the import substitution program.
The production of a 150 m³ propane supply unit based on an automobile semi-trailer has been completed.
Production of the first stone-lined liner by centrifugal casting.
Development and manufacture of the mobile local sorption unit "UNIKOM" (MSU) for Rosatom.
The launch of the assembly and welding workshop No. 8, with an area of 8056 m².
A propane supply unit for hydraulic fracturing, in a frame design, has been developed and tested.
The launch of mass production of a three-axle semi-trailer.
Commissioning of the modern engineering center "UNIKOM" with its own game room, gym, tennis room, conference room, and dining room.
Today, the production capacity of GC "UNIKOM" is 4.7 hectares. These are 9 production halls with a fleet of more than 200 units. The total area of ownership of GC "UNIKOM" is 14.7 hectares.